Consulting Engineering
Jupiter Police Department
Hurricane-Resilient Police Department & Emergency Operation Center
Consulting Engineering
CMTA provided engineering design and construction administration services to deliver this 75,000 SF CoLo Data Center in Nevada. The facility will deploy highly flexible and scalable solutions down to the rack level, with client needs ranging from low density applications to Direct-To-Chip rack loads exceeding 100 kW per rack. Targeting an annualized PUE under 1.2, the design integrated liquid to chip cooling, active and passive rear door heat exchangers, thermal energy storage and critical thermal unloading, and multiple layers of systematic redundancy.