Catawba College
First Carbon Neutral Campus in the Southeast US
$150M
Energy Savings for Clients
50M
Square Feet of Renovated Buildings & Campuses
200
Megawatts of Renewable Energy Designed & Installed
CMTA's Performance Design-Build approach combines engineering, construction, commissioning, and long-term facility performance into a single integrated delivery model. By aligning the project team from planning through occupancy, owners benefit from improved collaboration, reduced risk, and faster decision-making throughout the project lifecycle.
Rather than simply delivering a completed building, we take responsibility for achieving measurable operational outcomes. Our team remains actively involved through installation, commissioning, and performance verification to ensure critical building systems are operating as intended.
The result is a seamless delivery process, verified facility performance, enhanced operational reliability, lower lifecycle costs, and a single source of accountability from project conception through long-term operation.