Performance Contracting

Pontotoc City Schools

Pontotoc City SchoolsPontotoc, Mississippi

This project in Pontotoc, Mississippi is a Guaranteed Energy Savings Contract that includes 7 facilities, over 386,568 square feet.

The phase 1 project scope included:

  • New building controls and new hot water boiler for Pontotoc High School
  • New hot water control valves and variable speed drives for pumps at Pontotoc High School
  • New backup generator for the Administration Building
  • HVAC system replacements for auditorium in Pontotoc Junior High School
  • New AHUs, AHU controls, boiler controls, feedwater heater, and steam traps for the Pontotoc Junior High School
  • Recommissioning the cafeteria AHU unit in the Pontotoc Middle School
  • New LED lighting retrofits and replacements for 7 schools
  • Motion sensing thermostats for 5 schools
  • New code-compliant kitchen cooking hood for D.T. Cox Elementary School

The phase 2 project scope included:

  • new rooftop unit for the Pontotoc Middle School auditorium
  • HVAC renovation, including new energy recovery ventilator, new split system heat pump and condensing unit, and 9 electric unit heaters for the Junior High School gymnasium basement
  • for the High School Band Hall, a new rooftop unit for a second floor classroom