This project was a Guaranteed Energy Savings Contract that included 12 buildings and over 914,000 square feet in the Floyd County School District, located in Prestonsburg, Kentucky. The project was 83% funded through energy and operational savings.
The project scope included:
- Roof replacements for May Valley Elementary School, Prestonsburg High School, South Floyd Elementary School
- HVAC renovation at May Valley Elementary School, replacing the existing 2-pipe hot/chilled water system with a boiler/cooling tower system with new water-source heat pumps and dedicated outside air
- LED lighting retrofits and replacements for over 10,000 light fixtures throughout the district
- Controls optimization at 10 facilities across the district, including the implementation of demand limiting controls at 5 schools
- Utility rate changes and billing error corrections eliminating over $10,000 in annual overcharges
- Water leak repair at Duff-Allen Central Elementary School, resulting in over $20,000 in annual water savings
- Installation of district-owned trash compactors replacing dumpsters and rental compactors, resulting in over $68,000 in annual waste collection savings