Kentucky State Office Buildings

Guaranteed Energy Savings Contract

Contract Amount: $877,530

Guaranteed Savings: $78,840

This project was a Guaranteed Energy Savings Project that took place over the span of three months in Lexington, KY, London, KY, and Madisonville, KY. The project covered three buildings totaling 152,700 sq.ft. Funding for this project was 100% covered from savings with no escalation assumed for energy maintenance savings. The sale of the tax exempt lease purchase was solicited by CMTA and administered by Bank of America. This project was completed on schedule. 

  • New chiller and plant controls, new gas boiler, variable speed pumps, new DDC controls, LED lighting at Spindletop Administration Building¬†
  • Re-commissioning of HVAC controls to optimize energy efficiency at London State Office Building¬†
  • Re-commissioning of HVAC controls to optimize energy efficiency at the Madisonville State Office Building

State Office Buildings Energy Use

[{"x":"JAN","Baseline":"147600.0","Guaranteed":"114698.0","Actual":"92240.0"},{"x":"FEB","Baseline":"265440.0","Guaranteed":"206970.0","Actual":"164800.0"},{"x":"MAR","Baseline":"385280.0","Guaranteed":"299778.0","Actual":"256480.0"},{"x":"APR","Baseline":"592120.0","Guaranteed":"452324.0","Actual":"348240.0"},{"x":"MAY","Baseline":"732080.0","Guaranteed":"559775.0","Actual":"426840.0"},{"x":"JUN","Baseline":"847560.0","Guaranteed":"649300.0","Actual":"504280.0"},{"x":"JUL","Baseline":"960760.0","Guaranteed":"736752.0","Actual":"587160.0"},{"x":"AUG","Baseline":"1082800.0","Guaranteed":"830986.0","Actual":"689080.0"},{"x":"SEP","Baseline":"1238920.0","Guaranteed":"950867.0","Actual":"809960.0"},{"x":"OCT","Baseline":"1407960.0","Guaranteed":"1080730.0","Actual":"951880.0"},{"x":"NOV","Baseline":"1587880.0","Guaranteed":"1218870.0","Actual":"1082680.0"},{"x":"DEC","Baseline":"1755920.0","Guaranteed":"1348788.0","Actual":"1200440.0"}]
What does this data mean?
Baseline: The annual energy consumption before the project
Guaranteed: CMTA's guaranteed energy use for the client post-project
Actual: The measured energy use after the project

CMTA provided one of the best construction experiences I have been a part of in my 32 years plus experience.

Scotty Campbell, Operations Kentucky Finance and Administration Cabinet

Actual Savings Averaging $105,095 per year
33% above guarantee