Publications Categories - icon

Publications

Categories

Publications Key

  • CM: Commercial
  • CS: Codes and Standards
  • ED: Education
  • GV: Government
  • PC: Performance Contracting
  • ZE: Zero Energy

Government

Cincinnati’s District Three Police Station was featured in the Winter 2017 issue of High Performing Buildings.

The Police Station, which is the first Zero Energy Police Station in the United States, was engineered by CMTA. emersionDESIGN of Cincinnati was the architect.

Government

The first Zero Energy Police Station in the United States received a first-place award in ASHRAE’s National Technology Awards in 2017.

Cincinnati’s District Three Police Station was recognized in the Winter 2017 issue of High Performing Buildings. This 24/7/365 facility achieved a 50% energy reduction making the 329 kW solar PV array affordable. The facility also has a net metering agreement with the local utility that provides revenue from selling all unneeded power back to the gird.

Government

Connecting the past and the present with light.

The Franklin County Courthouse earned a 2015 Illumination Award of Merit for the lighting work that accentuates the exterior features of the building including 16 limestone columns that surround the new plaza and frame the courthouse. The original building was constructed in 1835.